{"id":1887,"date":"2026-10-01T10:50:38","date_gmt":"2026-10-01T10:50:38","guid":{"rendered":"https:\/\/www.exceldepartment.com\/?p=1887"},"modified":"2026-10-31T12:14:04","modified_gmt":"2026-10-31T12:14:04","slug":"power-bi-implementation-project-plan-2026","status":"publish","type":"post","link":"https:\/\/www.exceldepartment.com\/en\/power-bi-implementation-project-plan-2026\/","title":{"rendered":"Power BI Implementation \u2013 Project Plan for Swedish Companies 2026"},"content":{"rendered":"<div class=\"page-content container\">\n<p>You have decided to adopt Power BI. Now the real work begins. How do you make sure the project succeeds? This guide gives you a proven 12-week project plan that actually works.<\/p>\n<p>At Excel Department we have led 60+ Power BI implementations for Swedish companies. We have seen projects that take three months and deliver value from day one. We have also seen projects that drag on for two years and are never used. The difference is the methodology. This guide gives you the methodology that works.<\/p>\n<h2 id=\"varf\u00f6r-de-flesta-bi-projekt-misslyckas\">Why most BI projects fail<\/h2>\n<p>Before we dive into the solution, let&#8217;s talk about the problems.<\/p>\n<p><strong>Gartner&#8217;s research shows:<\/strong> 70-80% of BI projects fail or do not deliver the expected value.<\/p>\n<p><strong>Common causes we have seen:<\/strong><\/p>\n<p><strong>1. Big Bang approach<\/strong> \u201cWe&#8217;ll migrate all 50 reports in three months!\u201d Result: chaos, missed deadlines, frustrated users.<\/p>\n<p><strong>2. IT-driven instead of business-driven<\/strong> IT builds what they think the business needs. The business doesn&#8217;t use it.<\/p>\n<p><strong>3. No training<\/strong> \u201cPower BI is easy, people will figure it out.\u201d Result: nobody uses the reports.<\/p>\n<p><strong>4. No data governance<\/strong> Different dashboards show different numbers. Nobody knows which one is right.<\/p>\n<p><strong>5. Perfectionism<\/strong> \u201cWe can&#8217;t launch until everything is perfect.\u201d Result: the project drags on indefinitely.<\/p>\n<p><strong>Our methodology avoids all of these pitfalls.<\/strong> Iterative delivery, business focus, training from day one, data governance from the start.<\/p>\n<\/p>\n<h2 id=\"projektplan-12-veckor-fr\u00e5n-beslut-till-v\u00e4rde\">Project plan: 12 weeks from decision to value<\/h2>\n<p>We divide the implementation into six phases. Each phase has clear deliverables and decision points.<\/p>\n<h3 id=\"fas-1-kartl\u00e4ggning-och-strategi-vecka-1-2\">Phase 1: Discovery and strategy (Weeks 1-2)<\/h3>\n<p><strong>Purpose:<\/strong> Understand the current situation, define goals, create a roadmap.<\/p>\n<h4 id=\"vecka-1-nul\u00e4gesanalys\">Week 1: Current-state analysis<\/h4>\n<p><strong>Activities:<\/strong><\/p>\n<p><strong>Workshop with key people (4 hours):<\/strong> &#8211; Which reports do you use today? (Excel, other systems) &#8211; Which decisions are based on the reports? &#8211; What works well? What is painful? &#8211; What are your most important KPIs?<\/p>\n<p><strong>Data source inventory:<\/strong> &#8211; List all systems with data (accounting system, CRM, Excel files, databases) &#8211; Identify data owners &#8211; Document how data is updated today &#8211; Assess data quality<\/p>\n<p><strong>User interviews (5-10 people):<\/strong> &#8211; CFO, controllers, sales manager, operations manager &#8211; Which reports do they need? &#8211; How do they make decisions today? &#8211; What are they missing?<\/p>\n<p><strong>Output:<\/strong> &#8211; Documented list of existing reports &#8211; Data source map &#8211; User needs and pain points<\/p>\n<h4 id=\"vecka-2-strategi-och-prioritering\">Week 2: Strategy and prioritisation<\/h4>\n<p><strong>Activities:<\/strong><\/p>\n<p><strong>Define success measures:<\/strong> What does \u201csuccessful implementation\u201d mean? &#8211; Time savings? (X hours\/month) &#8211; Faster decisions? (From weeks to days) &#8211; Better insights? (Find X unprofitable customers) &#8211; User adoption? (X% use it regularly)<\/p>\n<p><strong>Prioritise reports:<\/strong> Use a simple matrix:<\/p>\n<table>\n<thead>\n<tr>\n<th>Report<\/th>\n<th>Business value (1-5)<\/th>\n<th>Complexity (1-5)<\/th>\n<th>Priority<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Sales dashboard<\/td>\n<td>5<\/td>\n<td>2<\/td>\n<td>High<\/td>\n<\/tr>\n<tr>\n<td>Cash flow forecast<\/td>\n<td>5<\/td>\n<td>4<\/td>\n<td>Medium<\/td>\n<\/tr>\n<tr>\n<td>HR statistics<\/td>\n<td>2<\/td>\n<td>2<\/td>\n<td>Low<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Choose 1-2 with high value and low complexity as a pilot.<\/p>\n<p><strong>Define roles:<\/strong> &#8211; <strong>Sponsor:<\/strong> CEO or CFO (decision authority, budget) &#8211; <strong>Project manager:<\/strong> Drives the project day to day &#8211; <strong>Data champions:<\/strong> 2-3 people who learn Power BI &#8211; <strong>IT contact:<\/strong> Gateway, security, infrastructure &#8211; <strong>Super users:<\/strong> 5-10 people from different departments<\/p>\n<p><strong>Create a roadmap:<\/strong><\/p>\n<pre><code>M\u00e5nad 1-3: Pilot (1-2 rapporter)\nM\u00e5nad 4-6: Skalning (5-10 rapporter)\nM\u00e5nad 7-12: Vidareutveckling och optimering<\/code><\/pre>\n<p><strong>Output:<\/strong> &#8211; Defined success measures &#8211; Prioritised report list &#8211; Role matrix with names &#8211; 12-month roadmap &#8211; Budget and resource plan<\/p>\n<p><strong>Decision point:<\/strong> Go\/No-go for the pilot phase.<\/p>\n<h3 id=\"fas-2-pilot-implementation-vecka-3-6\">Phase 2: Pilot implementation (Weeks 3-6)<\/h3>\n<p><strong>Purpose:<\/strong> Build 1-2 reports, learn the tool, prove the value.<\/p>\n<h4 id=\"vecka-3-datak\u00e4llintegration\">Week 3: Data source integration<\/h4>\n<p><strong>Activities:<\/strong><\/p>\n<p><strong>Connect the pilot report&#8217;s data sources:<\/strong> &#8211; Install Power BI Gateway if necessary &#8211; Configure database connections &#8211; Set up authentication and security &#8211; Test the connection<\/p>\n<p><strong>Power Query transformation:<\/strong> &#8211; Clean and structure data &#8211; Create staging tables if necessary &#8211; Document transformations &#8211; Validate data quality<\/p>\n<p><strong>Time:<\/strong> 2-3 days for a report with 2-3 data sources.<\/p>\n<p><strong>Output:<\/strong> Working data flow from source to Power BI.<\/p>\n<h4 id=\"vecka-4-datamodellering-och-utveckling\">Week 4: Data modelling and development<\/h4>\n<p><strong>Activities:<\/strong><\/p>\n<p><strong>Create the data model:<\/strong> &#8211; Define fact and dimension tables &#8211; Establish relationships &#8211; Create a date table (critical for time analysis) &#8211; Optimise for performance<\/p>\n<p><strong>Develop measures (DAX):<\/strong> &#8211; Define all KPIs &#8211; Create time-based comparisons (YTD, previous year, etc.) &#8211; Document calculation logic<\/p>\n<p><strong>Build visualisations:<\/strong> &#8211; Design with user feedback &#8211; Max 6-8 visuals per page &#8211; Add filters and slicers &#8211; Format according to the company&#8217;s visual identity<\/p>\n<p><strong>Time:<\/strong> 3-5 days depending on complexity.<\/p>\n<p><strong>Output:<\/strong> Finished report in Power BI Desktop.<\/p>\n<h4 id=\"vecka-5-test-och-validering\">Week 5: Testing and validation<\/h4>\n<p><strong>Critical step:<\/strong> The report must show the right numbers.<\/p>\n<p><strong>Activities:<\/strong><\/p>\n<p><strong>Data validation:<\/strong> &#8211; Compare Power BI with the existing Excel\/system row by row &#8211; Document discrepancies &#8211; Adjust calculations until all numbers match &#8211; Get approval from the data owner<\/p>\n<p><strong>User testing:<\/strong> &#8211; 3-5 end users test the report &#8211; Observe how they interact (don&#8217;t just ask) &#8211; Collect feedback on layout, functionality, performance &#8211; Adjust based on feedback<\/p>\n<p><strong>Performance testing:<\/strong> &#8211; Measure load time (should be &lt;5 seconds) &#8211; Optimise slow visuals &#8211; Test on different devices (desktop, tablet, mobile)<\/p>\n<p><strong>Time:<\/strong> 3-5 days.<\/p>\n<p><strong>Output:<\/strong> Validated report ready for publishing.<\/p>\n<h4 id=\"vecka-6-publicering-och-pilot-lansering\">Week 6: Publishing and pilot launch<\/h4>\n<p><strong>Activities:<\/strong><\/p>\n<p><strong>Publish to Power BI Service:<\/strong> &#8211; Create a dedicated workspace &#8211; Publish the report &#8211; Configure scheduled refresh &#8211; Set up security and permissions<\/p>\n<p><strong>Training for pilot users:<\/strong> &#8211; 1-hour workshop per user group &#8211; Show how to open the report &#8211; Demonstrate interactivity &#8211; Share documentation<\/p>\n<p><strong>Monitor usage:<\/strong> &#8211; Power BI Usage Metrics &#8211; Collect feedback from users &#8211; Note questions and problems &#8211; Respond quickly to issues (same day)<\/p>\n<p><strong>Time:<\/strong> 2-3 days.<\/p>\n<p><strong>Output:<\/strong> &#8211; Published and working report &#8211; Trained users &#8211; Documentation (user guide, technical documentation)<\/p>\n<p><strong>Decision point:<\/strong> Pilot successful? Continue to scaling. Problems? Adjust the approach.<\/p>\n<h3 id=\"fas-3-utbildning-och-kompetensuppbyggnad-vecka-7-8\">Phase 3: Training and skills development (Weeks 7-8)<\/h3>\n<p><strong>Purpose:<\/strong> Build internal capacity to scale.<\/p>\n<h4 id=\"vecka-7-data-champion-utbildning\">Week 7: Data champion training<\/h4>\n<p><strong>For the 2-3 people who will build reports:<\/strong><\/p>\n<p><strong>Day 1: Power BI Desktop basic course<\/strong> &#8211; Connecting data sources &#8211; Power Query transformations &#8211; Creating visualisations &#8211; Basic DAX<\/p>\n<p><strong>Day 2: Data modelling<\/strong> &#8211; Facts vs dimensions &#8211; Relationships and cardinality &#8211; Star schema best practices &#8211; Performance optimisation<\/p>\n<p><strong>Day 3: Advanced DAX<\/strong> &#8211; Time intelligence (YTD, previous period, etc.) &#8211; Context handling (CALCULATE, FILTER) &#8211; Common calculation patterns &#8211; Troubleshooting<\/p>\n<p><strong>Day 4: Publishing and administration<\/strong> &#8211; Power BI Service overview &#8211; Scheduled refresh &#8211; Security and RLS &#8211; Gateway configuration<\/p>\n<p><strong>Day 5: Practical exercise<\/strong> &#8211; Build a report from scratch &#8211; From data source to published report &#8211; With feedback and coaching<\/p>\n<p><strong>Time:<\/strong> 5 days of intensive training.<\/p>\n<p><strong>Output:<\/strong> 2-3 people can build their own reports.<\/p>\n<h4 id=\"vecka-8-organisation-och-governance\">Week 8: Organisation and governance<\/h4>\n<p><strong>Activities:<\/strong><\/p>\n<p><strong>Establish data governance:<\/strong> &#8211; Define a \u201csingle source of truth\u201d for KPIs &#8211; Create a glossary for measures (what does \u201cTotal sales\u201d mean?) &#8211; Document calculation logic &#8211; Establish an approval process for new reports<\/p>\n<p><strong>Create templates and best practices:<\/strong> &#8211; Report templates with the company&#8217;s visual identity &#8211; Naming conventions for measures and columns &#8211; Documentation templates &#8211; Power Query templates for common data sources<\/p>\n<p><strong>Security strategy:<\/strong> &#8211; Define which workspaces are needed &#8211; Role-based permissions &#8211; Row-level security strategy &#8211; Data classification (public\/internal\/confidential)<\/p>\n<p><strong>Output:<\/strong> &#8211; Governance document &#8211; Templates &#8211; Security framework<\/p>\n<h3 id=\"fas-4-skalning-vecka-9-10\">Phase 4: Scaling (Weeks 9-10)<\/h3>\n<p><strong>Purpose:<\/strong> Build 5-10 prioritised reports.<\/p>\n<h4 id=\"vecka-9-10-parallell-rapportutveckling\">Weeks 9-10: Parallel report development<\/h4>\n<p><strong>Strategy:<\/strong> Different people build different reports at the same time.<\/p>\n<p><strong>Example allocation:<\/strong> &#8211; <strong>Data champion 1:<\/strong> Finance dashboards (3 reports) &#8211; <strong>Data champion 2:<\/strong> Sales dashboards (2 reports) &#8211; <strong>Consultant (if engaged):<\/strong> Complex integrations (2 reports)<\/p>\n<p><strong>Daily standup (15 min):<\/strong> &#8211; What did I do yesterday? &#8211; What am I doing today? &#8211; Blockers?<\/p>\n<p><strong>Weekly review:<\/strong> &#8211; Show progress to the sponsor and stakeholders &#8211; Get feedback early &#8211; Adjust priorities as needed<\/p>\n<p><strong>Output:<\/strong> 5-10 production-ready reports.<\/p>\n<h3 id=\"fas-5-organisationslansering-vecka-11\">Phase 5: Organisation-wide launch (Week 11)<\/h3>\n<p><strong>Purpose:<\/strong> Roll out to the whole organisation.<\/p>\n<h4 id=\"vecka-11-lansering-och-training\">Week 11: Launch and training<\/h4>\n<p><strong>Activities:<\/strong><\/p>\n<p><strong>Communication plan:<\/strong> &#8211; Email to all users 1 week before launch &#8211; What is Power BI? Why are we switching? &#8211; Links to reports &#8211; Book training sessions<\/p>\n<p><strong>End-user training:<\/strong> &#8211; 30-minute sessions per department &#8211; Show the reports relevant to them &#8211; Hands-on exercise &#8211; Questions and answers<\/p>\n<p><strong>Support setup:<\/strong> &#8211; Dedicated Teams channel for questions &#8211; FAQ document &#8211; Quick response from data champions (same day)<\/p>\n<p><strong>Go-live:<\/strong> &#8211; Activate all reports at the same time &#8211; Monitor usage during the first week &#8211; Proactive follow-up with departments<\/p>\n<p><strong>Output:<\/strong> All users have access and basic knowledge.<\/p>\n<h3 id=\"fas-6-optimering-och-vidareutveckling-vecka-12\">Phase 6: Optimisation and further development (Week 12+)<\/h3>\n<p><strong>Purpose:<\/strong> Continuous improvement.<\/p>\n<h4 id=\"vecka-12-utv\u00e4rdering\">Week 12: Evaluation<\/h4>\n<p><strong>Measure success against defined goals:<\/strong> &#8211; Time savings: How much time is saved on manual reporting? &#8211; User adoption: How many open reports regularly? &#8211; Decision pace: Have decisions become faster? &#8211; ROI: Costs vs benefits<\/p>\n<p><strong>Collect feedback:<\/strong> &#8211; Survey to all users &#8211; In-depth interviews with key people &#8211; What works well? &#8211; What can be improved?<\/p>\n<p><strong>Identify the next wave:<\/strong> &#8211; Which reports should be built next? &#8211; New data sources to integrate? &#8211; Advanced features to introduce?<\/p>\n<p><strong>Output:<\/strong> Evaluation report and plan for the next 6 months.<\/p>\n<\/p>\n<h2 id=\"roller-och-ansvar\">Roles and responsibilities<\/h2>\n<p>Clear roles are critical for success.<\/p>\n<table>\n<colgroup>\n<col style=\"width: 23%\" \/>\n<col style=\"width: 30%\" \/>\n<col style=\"width: 46%\" \/>\n<\/colgroup>\n<thead>\n<tr>\n<th>Role<\/th>\n<th>Responsibility<\/th>\n<th>Time commitment<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Sponsor (CFO\/CEO)<\/strong><\/td>\n<td>Decisions, budget, communicating the importance<\/td>\n<td>2-3 hrs\/month<\/td>\n<\/tr>\n<tr>\n<td><strong>Project manager<\/strong><\/td>\n<td>Drives the project day to day, coordination<\/td>\n<td>50% of a full-time role<\/td>\n<\/tr>\n<tr>\n<td><strong>Data champions (2-3)<\/strong><\/td>\n<td>Build reports, support users<\/td>\n<td>50% in phases 2-4, then 20%<\/td>\n<\/tr>\n<tr>\n<td><strong>IT contact<\/strong><\/td>\n<td>Gateway, security, infrastructure<\/td>\n<td>10-20 hrs in total<\/td>\n<\/tr>\n<tr>\n<td><strong>Super users (5-10)<\/strong><\/td>\n<td>Help colleagues, collect feedback<\/td>\n<td>5% ongoing<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"budget-vad-kostar-det\">Budget: What does it cost?<\/h2>\n<p><strong>Internal cost (staff):<\/strong> &#8211; Project manager: 0.5 FTE \u00d7 3 months \u00d7 SEK 500\/hr \u00d7 176 hrs\/month = ~SEK 130,000 &#8211; Data champions: 3 \u00d7 0.5 FTE \u00d7 2 months \u00d7 SEK 500\/hr \u00d7 176 hrs\/month = ~SEK 265,000 &#8211; Other (meetings, testing, etc.): ~SEK 50,000 &#8211; <strong>Total internal cost: ~SEK 445,000<\/strong><\/p>\n<p><strong>External cost (if a consultant is engaged):<\/strong> &#8211; Discovery and strategy: SEK 40,000 &#8211; Training (5 days): SEK 50,000 &#8211; Pilot development: SEK 60,000 &#8211; Coaching during scaling: SEK 80,000 &#8211; <strong>Total external cost: ~SEK 230,000<\/strong><\/p>\n<p><strong>Licence costs (year 1):<\/strong> &#8211; Power BI Pro: 50 users \u00d7 SEK 70\/month \u00d7 12 = SEK 42,000 &#8211; Gateway (runs on an existing server): SEK 0 &#8211; <strong>Total licence cost: ~SEK 42,000<\/strong><\/p>\n<p><strong>Total project cost: 445,000 + 230,000 + 42,000 = ~SEK 717,000<\/strong><\/p>\n<p><strong>ROI example:<\/strong> If the project saves 40 hours\/month in manual reporting work: &#8211; Savings: 40 hrs \u00d7 SEK 500 \u00d7 12 months = SEK 240,000\/year &#8211; Payback: 717,000 \/ 240,000 = 3 years<\/p>\n<p>But the savings are often larger, and hard-to-value benefits (faster decisions, better insights) add value.<\/p>\n<h2 id=\"kritiska-framg\u00e5ngsfaktorer\">Critical success factors<\/h2>\n<p>After 60+ implementations we know what determines success:<\/p>\n<h3 id=\"ledningens-engagemang\">1. Management commitment<\/h3>\n<p>If the CEO or CFO doesn&#8217;t care, nobody else will. The sponsor must: &#8211; Communicate the importance regularly &#8211; Use the reports personally &#8211; Prioritise the project when resource conflicts arise<\/p>\n<h3 id=\"r\u00e4tt-pilotrapport\">2. The right pilot report<\/h3>\n<p>The first report sets the tone. Choose one that: &#8211; Is important enough that people care &#8211; Is not so critical that mistakes have catastrophic consequences &#8211; Has clear data sources &#8211; Can be built in 3-4 weeks<\/p>\n<h3 id=\"utbildning-fr\u00e5n-dag-ett\">3. Training from day one<\/h3>\n<p>Don&#8217;t wait until the end for training. Data champions start learning in week 1. End users get an introduction when the pilot launches.<\/p>\n<h3 id=\"iterativ-leverans\">4. Iterative delivery<\/h3>\n<p>Launch pilot \u2192 learn \u2192 adjust \u2192 scale. Not big bang.<\/p>\n<h3 id=\"data-governance-fr\u00e5n-start\">5. Data governance from the start<\/h3>\n<p>If different reports show different numbers, trust collapses. Establish a \u201csingle source of truth\u201d from day one.<\/p>\n<h2 id=\"n\u00e4r-du-b\u00f6r-anlita-konsult\">When you should hire a consultant<\/h2>\n<p>You can run the project yourselves, but consultant help speeds things up and reduces risk.<\/p>\n<p><strong>Hire a consultant if:<\/strong> &#8211; You lack Power BI expertise internally (nobody has used it before) &#8211; Tight deadline (must be done in 3 months) &#8211; Complex data source integration (many systems, APIs, legacy) &#8211; You want to avoid common mistakes &#8211; You need to train an internal team<\/p>\n<p><strong>Excel Department can help with:<\/strong> &#8211; Leading the whole project (from discovery to launch) &#8211; Building the pilot report together with your team &#8211; Intensive training for data champions (5 days) &#8211; Coaching during scaling (weekly check-ins) &#8211; Review and quality assurance<\/p>\n<p><a href=\"https:\/\/www.exceldepartment.com\/en\/contact-us\/\">Contact us<\/a> for a free consultation (30 min) and a tailored quote.<\/p>\n<h2 id=\"checklista-\u00e4r-ni-redo-att-starta\">Checklist: Are you ready to start?<\/h2>\n<ul class=\"task-list\">\n<li><label><input type=\"checkbox\" \/>Management is committed and has set aside a budget<\/label><\/li>\n<li><label><input type=\"checkbox\" \/>1-2 people can dedicate 50% of their time for 2-3 months<\/label><\/li>\n<li><label><input type=\"checkbox\" \/>You have identified 1-2 pilot reports<\/label><\/li>\n<li><label><input type=\"checkbox\" \/>Data sources are accessible and documented<\/label><\/li>\n<li><label><input type=\"checkbox\" \/>You have defined what success means<\/label><\/li>\n<li><label><input type=\"checkbox\" \/>A project manager has been appointed<\/label><\/li>\n<li><label><input type=\"checkbox\" \/>IT is involved and supportive<\/label><\/li>\n<\/ul>\n<p>If all are ticked: get going. If several are missing: start there.<\/p>\n<p><strong>Next steps:<\/strong><\/p>\n<ol type=\"1\">\n<li>Book a kickoff meeting with the sponsor, project manager and IT<\/li>\n<li>Carry out weeks 1-2 (discovery and strategy)<\/li>\n<li>Decide on internal vs external delivery<\/li>\n<li>Start the pilot phase<\/li>\n<\/ol>\n<p><strong>Related guides:<\/strong> &#8211; <a href=\"https:\/\/www.exceldepartment.com\/en\/power-bi-for-business-excel-to-dashboards\/\">Power BI for business: Complete guide<\/a> &#8211; <a href=\"https:\/\/www.exceldepartment.com\/en\/migrating-excel-to-power-bi\/\">Migrating from Excel to Power BI<\/a> &#8211; <a href=\"https:\/\/www.exceldepartment.com\/en\/power-bi-dashboards-every-cfo-needs-2026\/\">5 Power BI dashboards every CFO needs<\/a><\/p>\n<hr \/>\n<p><strong>Contact Excel Department:<\/strong> &#8211; <strong>Phone:<\/strong> <a href=\"tel:+46102642020\">010-264 20 20<\/a> &#8211; <strong>Email:<\/strong> <a href=\"mailto:info@exceldepartment.se\">info@exceldepartment.se<\/a> &#8211; <strong>Address:<\/strong> Slottsbacken 8, 111 30 Stockholm<\/p>\n<\/div>\n<div class=\"xld-cta\" style=\"margin:30px 0;padding:18px 20px;background:#f5f4f4;border-top:3px solid #a0ce4e\">\n<p style=\"margin:0 0 8px\"><strong>Need help with this?<\/strong> Our <a href=\"https:\/\/www.exceldepartment.com\/en\/excel-consultant\/power-bi-consultant\/\">Power BI consultants<\/a> can help you \u2013 the first consultation is free of charge.<\/p>\n<p style=\"margin:0\"><a href=\"https:\/\/www.exceldepartment.com\/en\/contact-us\/\">Book a free call<\/a> or phone <a href=\"tel:+46102642020\">010-264 20 20<\/a>.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Complete project plan for a Power BI implementation. From discovery to launch in 12 weeks. Best practices from 60+ Swedish implementations.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-1887","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"https:\/\/www.exceldepartment.com\/en\/wp-json\/wp\/v2\/posts\/1887","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.exceldepartment.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.exceldepartment.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.exceldepartment.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.exceldepartment.com\/en\/wp-json\/wp\/v2\/comments?post=1887"}],"version-history":[{"count":0,"href":"https:\/\/www.exceldepartment.com\/en\/wp-json\/wp\/v2\/posts\/1887\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.exceldepartment.com\/en\/wp-json\/wp\/v2\/media?parent=1887"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.exceldepartment.com\/en\/wp-json\/wp\/v2\/categories?post=1887"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.exceldepartment.com\/en\/wp-json\/wp\/v2\/tags?post=1887"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}